Blacklick Creek Sanitary Interceptor Sewer Section 6

City of Columbus


Project Overview

Extending the existing sewer system, this project featured a new 10 ft. diameter, 4-mile-long sewer constructed with an earth pressure balance tunnel boring machine (EPBTBM) and lined with precast concrete segments. The project spanned the Reynoldsburg-New Albany Road corridor and encountered varied ground conditions from glacial tills to shale.

Project Stats

Project Owner


City of Columbus

Services


  • TBM Tunnel Excavation
  • Shaft Excavation
  • Structure Construction

Markets


  • Sanitation & Wastewater

Location


Columbus, OH

Completion Year


2019

Project Value


$97.5 million

Project Size


  • 22600 ft of 10 ft ID precast concrete segment sanitary tunnel
  • 8 access and drop structures
  • 400 ft of 10 ft RCP and open cut

Contract Type


Design-Bid-Build