Line 5 Replacement and Tunnel Project

Enbridge


Project Overview

Jay Dee Contractors provided pre-construction services for the Line 5 Replacement and Tunnel Project with Enbridge. The work included design and constructibility reviews, scheduling, detailed work breakdown structures, and cost estimation to support project planning and execution.

Project Stats

Project Owner


Enbridge

Services


  • TBM Tunnel Excavation
  • Shaft Excavation
  • Structure Construction
  • Ground Improvement

Markets


  • Energy

Location


Mackinaw City, MI

Completion Year


2020

Project Value


$2.1 million

Project Size


  • 21,000 ft long, 23 ft diameter tunnel
  • 17 bar tunnel pressure

Contract Type


CM/GC