Designed to alleviate sewer backups and reduce surface flooding, this project involved the construction of 2,500 ft. of 78 in. diameter RCP via pipe jacking, 4 ea. rib & lag shafts, and a 232 ft. deep drop shaft that connected to an existing 13 ft. 9 in. tunnel. The drop shaft was excavated by drilling & blasting. Key challenges included live connection work from the drop shaft to the existing 13 ft. 9 tunnel, and working within Chicago city limits and the minimal right-of-way given to construct the project.

Project Stats

Project Owner


City of Chicago Department of Water Management

Services


  • TBM Tunnel Excavation
  • Shaft Excavation
  • Structure Construction

Markets


  • Sanitation & Wastewater

Location


Chicago, IL

Completion Year


2016

Project Value


$20.4 million

Project Size


  • 2,500 ft of 78 inch RCP in sanitary tunnel
  • 1 cast in place drop shaft 230 ft deep
  • 1 live connection to existing 13 ft 9 CSO tunnel

Contract Type


Design-Bid-Build